M-1 Motorway
Pakistan's third motorway, the 155 km 6-lane M-1, linking Peshawar with the federal capital, Islamabad, has been operational since 30 October 2007.
M-2 Motorway
Pakistan's first motorway, the 367 km 6-lane M-2, connecting the cities of Islamabad and Lahore, was constructed by South Korea's Daewoo Corporation and was inaugurated in November 1997 and was the first motorway to be built in South Asia.
M-3 Motorway
The plan to construct Pakistan's second motorway, the 54 km 4-lane M-3, linking the Pindi Bhattian Junction on the M-2 withFaisalabad was finalized in 1996 with an estimated cost of Rs. 8 billion. Initially, it was planned to have 6-lanes, however, due to the shortage of funds, it was decided reduce the number of lanes to 4 with an option to upgrade it to 6-lanes in future. Construction of the M-3 began in May 2002 and it was completed ahead of schedule in September 2003 at a cost of Rs 5.3 billion. It was inaugurated and opened for traffic on 2 October 2003. Two bridges, one over a railway track and the second on a canal, were constructed on the motorway, while two interchanges near Sahianwala and Faisalabad were constructed in the second phase.
M-4 Motorway
Construction of Pakistan's fourth motorway, the 233 km 4-lane M-4, began on 19 August 2009. Once completed, it will link Multan with the M-3 Motorway at Faisalabad.And Faisalabad to Toba Tek Singh moterway ready for traffic in the End of December 2013
M-5 Motorway
The M-5 is a planned 80 km long, 4-lane motorway that will link Multan with Dera Ghazi Khan. It will be constructed after the completion of the M-4 Motorway.
M-6 Motorway
The M-6 is a planned 365 km long, 4 lane motorway that will link Dera Ghazi Khan with Ratodero. It will be constructed after the completion of the M-5 Motorway.
M-7 Motorway
The M-7 is a planned 270 km long, 4-lane motorway that will link Dadu with Hub.
M-8 Motorway
The 892 km 4-lane M-8 is under-construction in Sindh and Balochistan provinces. Initially, it will have 2 lanes with a further 2 lanes planned. The 4 lane motorway will be upgradable to 6 lanes. Once completed it will directly link the port city of Gwadar with the rest of Pakistan's motorway network at Ratodero where it will link up with the M-6 Dera Ghazi Khan-Ratodero Motorway.
M-9 Motorway
The current 4-lane Hyderabad-Karachi "Super Highway" is in the process of being upgraded into a 6-lane access-controlled motorway, designated the "M-9". Expression of Interest (EOI) were invited by the National Highway Authority (NHA) in May 2011. The NHA awarded the Rs. 24.93 billion contract to the Malaysian construction company, Bina Puri Holdings Bhd, on Built Operate Transfer (BOT) basis in January 2012. The proposed 136-km long motorway will be completed in three years. The M-9 Motorway will have 7 interchanges, 2 service areas at the midway points and 16 toll plazas on entry and exit points.
__________________
“You were born with wings, why prefer to crawl through life?”