SCHEDULE I
(See Regulation 3)
List of projects requiring an IEE
A. Agriculture, Livestock and Fisheries
1. Poultry, livestock, stud and fish farms with total cost more than Rs.10
million
2. Projects involving repacking, formulation or warehousing of agricultural
products

B. Energy
1. Hydroelectric power generation less than 50 MW
2. Thermal power generation less than 200 KW
3. Transmission lines less than 11 KV, and large distribution projects
4. Oil and gas transmission systems
5. Oil and gas extraction projects including exploration, production,
gathering systems, separation and storage
6. Waste-to-energy generation projects

C. Manufacturing and processing
1. Ceramics and glass units with total cost more than Rs.50 million
2. Food processing industries including sugar mills, beverages, milk and
dairy products, with total cost less than Rs.100 million
3. Man-made fibers and resin projects with total cost less than Rs.100 million
4. Manufacturing of apparel, including dyeing and printing, with total cost
more than Rs.25 million
5. Wood products with total cost more than Rs.25 million

D. Mining and mineral processing
1. Commercial extraction of sand, gravel, limestone, clay, sulphur and other
minerals not included in Schedule II with total cost less than Rs.100
million
2. Crushing, grinding and separation processes
3. Smelting plants with total cost less than Rs.50 million

E. Transport
1. Federal or Provincial highways (except maintenance, rebuilding or
reconstruction of existing metalled roads) with total cost less than Rs.50
million
2. Ports and harbor development for ships less than 500 gross tons

F. Water management, dams, irrigation and flood protection
1. Dams and reservoirs with storage volume less than 50 million cubic
meters of surface area less than 8 square kilometers
2. Irrigation and drainage projects serving less than 15,000 hectares
3. Small-scale irrigation systems with total cost less than Rs.50 million

G. Water supply and treatment
Water supply schemes and treatment plants with total cost less than Rs.25 million

H. Waste disposal
Waste disposal facility for domestic or industrial wastes, with annual capacity less than 10,000 cubic meters

I. Urban development and tourism
1. Housing schemes
2. Public facilities with significant off-site impacts (e.g. hospital wastes)
3. Urban development projects

J. Other projects
Any other project for which filing of an IEE is required by the Federal Agency
under sub-regulation (2) of Regulation 5

SCHEDULE II
(See Regulation 4)
List of projects requiring an EIA
A. Energy
1. Hydroelectric power generation over 50 MW
2. Thermal power generation over 200 MW
3. Transmission lines (11 KV and above) and grid stations
4. Nuclear power plans
5. Petroleum refineries

B. Manufacturing and processing
1. Cement plants
2. Chemicals projects
3. Fertilizer plants
4. Food processing industries including sugar mills, beverages, milk and
dairy products, with total cost of Rs.100 million and above
5. Industrial estates (including export processing zones)
6. Man-made fibers and resin projects with total cost of Rs.100 M and above
7. Pesticides (manufacture or formulation)
8. Petrochemicals complex
9. Synthetic resins, plastics and man-made fibers, paper and paperboard,
paper pulping, plastic products, textiles (except apparel),printing and
publishing, paints and dyes, oils and fats and vegetable ghee projects, with
total cost more than Rs.10 million
10. Tanning and leather finishing projects

C. Mining and mineral processing
1. Mining and processing of coal, gold, copper, sulphur and precious stones
2. Mining and processing of major non-ferrous metals, iron and steel rolling
3. Smelting plants with total cost of Rs.50 million and above

D. Transport
1. Airports
2. Federal or Provincial highways or major roads (except maintenance,
rebuilding or reconstruction of existing roads) with total cost of Rs.50
million and above
3. Ports and harbor development for ships of 500 gross tons and above
4. Railway works

E. Water management, dams, irrigation and flood protection
1. Dams and reservoirs with storage volume of 50 million cubic meters and
above or surface area of 8 square kilometers and above
2. Irrigation and drainage projects serving 15,000 hectares and above

F. Water supply and treatment
Water supply schemes and treatment plants with total cost of Rs.25 million and above

G. Waste Disposal
1. Waste disposal and/or storage of hazardous or toxic wastes (including
landfill sites, incineration of hospital toxic waste)
2. Waste disposal facilities for domestic or industrial wastes, with annual
capacity more than 10,000 cubic meters

H. Urban development and tourism
1. Land use studies and urban plans (large cities)
2. Large-scale tourism development projects with total cost more than Rs.50
million

I. Environmentally Sensitive Areas
All projects situated in environmentally sensitive areas

J. Other projects
1. Any other project for which filing of an EIA is required by the Federal
Agency under sub-regulation (2) of Regulation 5.
2. Any other project likely to cause an adverse environmental effect

SCHEDULE III
(See Regulation 7)
IEE/EIA Review Fees

SCHEDULE IV
[See Regulation 8(2)(a)]
Application Form

SCHEDULE V
[See Regulation 12]
Decision on IEE

SCHEDULE VI
[See Regulation 12]
Decision on EIA

SCHEDULE VII
[See Regulation 13(2)]
Undertaking

SCHEDULE VIII
(See Regulation 21)
Form of Registers for IEE and EIA projects