Friday, April 19, 2024
08:21 PM (GMT +5)

Go Back   CSS Forums > General > News & Articles > The Express Tribune

Reply Share Thread: Submit Thread to Facebook Facebook     Submit Thread to Twitter Twitter     Submit Thread to Google+ Google+    
 
LinkBack Thread Tools Search this Thread
  #1  
Old Tuesday, January 07, 2014
HASEEB ANSARI's Avatar
Senior Member
Medal of Appreciation: Awarded to appreciate member's contribution on forum. (Academic and professional achievements do not make you eligible for this medal) - Issue reason:
 
Join Date: Dec 2012
Location: Pakistan
Posts: 2,803
Thanks: 93
Thanked 1,321 Times in 834 Posts
HASEEB ANSARI is a glorious beacon of lightHASEEB ANSARI is a glorious beacon of lightHASEEB ANSARI is a glorious beacon of lightHASEEB ANSARI is a glorious beacon of lightHASEEB ANSARI is a glorious beacon of light
Default Pakistan’s energy security

Pakistan’s energy security
By Zahir Kazmi


Energy shortages are driving Pakistanis to an edge and are exacerbating their economic insecurities as well. At places, people have taken to the streets for want of gas. Can these concerns be alleviated by an uninterrupted availability of inexpensive energy sources? Nuclear energy is affordable, whereas other sources are swiftly becoming either financially or politically unfeasible. A good recipe that comprises a mix of resources can enhance Pakistan’s energy security. There is lots of criticism about the decision to construct two 2,200MW nuclear power plants (NPP) on Karachi’s coastline by 2019. Interestingly, these anxieties have been offered sans solutions. In November last year, Nawaz Sharif had announced that his administration has envisioned that nuclear energy will add 40,000MW to the national grid by the year 2050 at an affordable cost. What role will nuclear power generation play in Pakistan’s energy mix?

Pakistan has an installed electricity generation capacity of 22,797MW. The average demand is 17,000MW and the shortfall is between 4,000 and 5,000MW. Oil (35.2 per cent), hydel (29.9 per cent), gas (29 per cent), and nuclear and imported (5.8 per cent) are the principal sources. In the next 10 years, peak electricity demand is expected to rise by four to five per cent, which is roughly 1,500MW. This dismal forecast is due to a lopsided energy mix, diminishing indigenous fuel reserves, increasing circular debt and transmission hold-ups. Pakistan has almost exhausted its gas reserves. Imported oil’s price hikes affect the budget and its constant supply cannot be guaranteed. Pakistan has the potential to meet these energy challenges through hydel power but there are political and environmental issues in building dams. Rationality demands reducing reliance on oil and going for alternatives. The development of alternatives does not happen overnight. Pakistan will have to rely on imported fuels for the interim period at a huge cost. LNG is difficult to import, using coal has environmental issues, using shale gas also has environmental issues attached with it, and wind power has transmission network challenges.

Nuclear energy seems the best option for Pakistan because the cost of oil-based generation, other alternatives and their indigenisation is pretty high. The nuclear reactors that are being constructed in Karachi are called Advance China Pressurised–1000 reactors and are the latest technology over which China has complete intellectual property rights. These reactors are often confused with Chinese CPR-1000 design that is an advanced version of French M-310 technology. China also has complete intellectual property rights for that technology. It’s a global norm that nuclear reactors are released for sale only after passing through several developmental stages. Like any other industry, there is always a first buyer and here Pakistan is no exception. Besides this, the International Atomic Energy Agency’s (IAEA) watchful eyes do not compromise on design and safeguards standards. International practices show that the close proximity of reactors to Karachi should not be of great concern. Sixty-five out of 104 reactors in the US are within a 10-50 miles vicinity of densely populated states like New York. Despite the Three Mile Island nuclear disaster of 1979, those ageing American reactors pose no safety concerns. It has been internationally accepted that NPPs are more environment-friendly compared with fossil fuel-based plants. Industrialisation has its hazards — even dams have environmental issues — but the fact remains that NPPs provide clean and uninterrupted power supply at a competitive cost.

The two reactors have a reported US$9.1 billion capital cost, which is expensive indeed. However, these will be cheaper in the long-term due to affordable power generation cost. China is not only providing the NPP technology; unlike other suppliers, it is reportedly offering 82 per cent of the financing as well. The current energy basket rate for electricity generation in Pakistan is around Rs12.3/KWHr, which is calculated by taking a mean of the cost of electricity from all sources. In that sense, NPPs with a levelised cost of electricity in the range of Rs5-8/KWHr is worthwhile.

The Fukushima nuclear disaster in 2011 cast a dark spell on the use of nuclear energy — but for a short while. Japan had abandoned its reliance on nuclear energy but has recently reverted its stance. The Fukushima disaster was not due to technical failures or inadequate safety features. An unparalleled tsunami completely swamped the back-up power for cooling the plants. China has offered cutting edge technology with the latest safety and design features. The Pakistan Nuclear Regulatory Authority and the IAEA remain actively involved in selecting the sites for the new reactors and a thorough survey has been done in this regard.

There is a misperception that China has violated its obligations of the Nuclear Suppliers Group (NSG) in offering these reactors to Pakistan. It is worth noting that China is, in fact, meeting international legal obligations of a nuclear agreement that it made with Pakistan in 1986, which was before it joined the NSG in 2004. This, notwithstanding, these reactors, will be under IAEA safeguards and will produce electricity, not bombs. The criticism about these reactors is political in context. This peaceful nuclear cooperation can be considered to be an effort on Pakistan’s part to counterbalance the Indo-US nuclear deal and New Delhi’s efforts to join the NSG, which is a nuclear export control cartel. The US offered the nuclear deal to India for economic returns and also because of New Delhi’s so-called potential as a counterweight to Beijing. Pakistan’s agreement with China predates the Indo-US nuclear deal and Islamabad has no extra-regional ambitions. The Pakistan-China deal does not violate international norms but the Indo-US nuclear deal does. The US bent its domestic laws and pressurised NSG members to bend theirs for potential trade with India.

Nuclear energy is a quintessential part of Pakistan’s energy mix. Scarce hydrocarbon sources pose political, economic and environmental issues. Nuclear energy is a safe and viable alternative. Pakistan spends $1 billion in oil imports per 1,000 MW, which is not cost-effective. Nuclear energy can reduce that burden. China has shared the safest and the most cutting edge technology that will alleviate the burden on the Pakistani economy and enhance energy security — no one else has made us such an offer. Nuclear energy is an effective solution that will produce uninterrupted electricity at an affordable price. Let’s hope we overcome the simple challenge of switching on a light bulb.

Published in The Express Tribune, January 7th, 2014.
__________________
"Nay! man is evidence against himself. Though he puts forth his excuses." Holy Qur'an (75:14-15)
Reply With Quote
The Following 2 Users Say Thank You to HASEEB ANSARI For This Useful Post:
abidturk (Wednesday, January 08, 2014), usmanwrites (Tuesday, January 07, 2014)
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On


Similar Threads
Thread Thread Starter Forum Replies Last Post
G.K objectives for all terminator Topics and Notes 18 Friday, January 21, 2022 01:35 AM
Please check my third attempt Jugni Essay 1 Thursday, September 01, 2011 03:11 PM
Energy Crisis And Pakistan Must Read Roshan wadhwani Current Affairs Notes 0 Monday, June 27, 2011 05:22 PM
sectariannism seep Current Affairs 0 Saturday, January 29, 2011 05:26 PM


CSS Forum on Facebook Follow CSS Forum on Twitter

Disclaimer: All messages made available as part of this discussion group (including any bulletin boards and chat rooms) and any opinions, advice, statements or other information contained in any messages posted or transmitted by any third party are the responsibility of the author of that message and not of CSSForum.com.pk (unless CSSForum.com.pk is specifically identified as the author of the message). The fact that a particular message is posted on or transmitted using this web site does not mean that CSSForum has endorsed that message in any way or verified the accuracy, completeness or usefulness of any message. We encourage visitors to the forum to report any objectionable message in site feedback. This forum is not monitored 24/7.

Sponsors: ArgusVision   vBulletin, Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.